Salt Creek West Loop Buildout

Project Summary

Our shops provided piping valve set shop fabrication for the Salt Creek West Loop Buildout Project. Work included:

  • Carbon dioxide (CO2) gathering
  • Production gathering
  • CO2 injection
  • Water injection systems
  • SAB area pipe spools
  • Stainless steel pipe spools for RCS3 system for enhanced oil recovery (EOR)

Client
Anadarko Petroleum Corp.

Location
West

Project Type
Prefabrication

Azco Role
Pipe Prefabrication