Manufacturing Plant Upgrades

Project Summary

Our team has worked with the Kimberly-Clark Corp. on various manufacturing plant upgrades and expansions. Among them:

  • Structural steel erection (800 tons) for a 169,000-square-foot expansion of the Feminine Care Plant
  • Structural steel erection for the expansion of paper machine #8 for the Neenah Paper division
  • Installation of a sodium hypochlorite double-wall piping system
  • Relocation of a water outfall
  • Structural steel erection (300 tons) for an addition and renovation to an existing plant; work included roof replacement at paper machine #4 at Neenah Paper
  • Supervision, labor and equipment for the unloading and structural steel erection, steel joists, metal deck and other steel (2,200 tons total) for the 550,000-square-foot Feminine Care plant

Client
Kimberly-Clark Corp.

Location
Midwest

Project Type
Construction