AZCO is performing construction of solar arrays for nine solar projects and fabrication of substation steel for three of those projects. The projects combined provide capacity to power nearly 225,000 homes.
In 2021, the team procured 1.5 million bifacial monocrystalline photovoltaic (PV) modules for three initial sites. Burns & McDonnell performed conceptual and detailed electrical design, environmental studies and permitting, civil and structural design for the modules. AZCO delivered the substation steel for all three sites, and the team designed and built 10 miles of high-voltage overhead transmission lines and substations.
The six remaining solar sites under construction are part of an integrated engineer-procure-construct (EPC) contract framework that creates efficiencies for environmental studies and permitting, ongoing electrical engineering, civil and structural design, substation construction, and interconnection tie-in support.