Riverton Power Plant Expansion

We were contracted for the aboveground mechanical package for Riverton’s Unit 12 combined-cycle conversion project.

Our fabrication shop fabricated P91 chrome-moly and heavy-wall carbon steel pipe spools for risers, downcomers, burner and SCR systems at a combined-cycle nominal 250-megawatt (MW) capacity gas-fired power facility. The project included shop-installed valves as well as fabricated lube oil, control oil, gland steam, spray water and drain piping.

Fabrication was in support of the engineer-procure-construct team of AZCO and Burns & McDonnell, providing field installation of the Nooter/Eriksen heat recovery steam generator (HRSG), the 100-MW Siemens steam turbine generator and all associated piping. Work also included the balance-of-plant piping, structural steel erection of the steam turbine building, assembly of the steam surface condenser, and miscellaneous pumps, skids, transformers, bridge cranes, and chemical injection equipment.

Client

Empire District

Services

Construction

Fabrication

Pipe Fabrication

Industry

Power